This inventor holds 3 USPTO granted patents. Top assignees: Barnard Construction Company, Inc., Other. Active years: 2000-2010.
Location History:
- Phoenix, AZ (US) (2000)
- Bozeman, MT (US) (2010)
Company Filing History:
Years Active: 2000-2010
Title: Gregory L. Schleining: Innovator in Pipeline Installation Technology
Introduction
Gregory L. Schleining is a notable inventor based in Phoenix, AZ, who has made significant contributions to the field of pipeline installation technology. With a total of 3 patents to his name, he has developed innovative solutions that enhance the efficiency and effectiveness of pipeline construction.
Latest Patents
One of Gregory's latest patents is an apparatus for installing pipeline fill. This innovative device is designed for depositing fill material over a pipeline. It features a wide-track carriage that straddles the pipeline trench, equipped with a shaker screen mechanism for screening aggregate fill material, such as excavated native spoils. The screened fill material is then fed into the trench via a pivoting conveyor, which is controlled by a pivotable and extensible boom. Additionally, a mix auger is included for mixing water and cement with the fill material, creating a cementitious Controlled Low Strength Material fill when necessary.
Career Highlights
Gregory L. Schleining is currently associated with Barnard Construction Company, Inc., where he applies his expertise in pipeline installation technology. His work has been instrumental in advancing construction methods and improving project outcomes.
Collaborations
Gregory has collaborated with several professionals in his field, including Jerry B. Askin and Joseph P. Nelson. These partnerships have contributed to the development of innovative solutions in pipeline installation.
Conclusion
Gregory L. Schleining's contributions to pipeline installation technology through his patents and work at Barnard Construction Company, Inc. highlight his role as a key innovator in the industry. His inventions continue to influence construction practices and improve efficiency in pipeline projects.