The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Mar. 31, 2026
Filed:
Dec. 07, 2023
Ccteg Chongqing Research Institute Co., Ltd., ChongQing, CN;
Yongjiang Zhang, ChongQing, CN;
Lindong Guo, ChongQing, CN;
Xusheng Zhao, ChongQing, CN;
Zhenfei Huang, ChongQing, CN;
Junjian Xu, ChongQing, CN;
Shuai Li, ChongQing, CN;
Wenbin Wu, ChongQing, CN;
Zhanjin Lu, ChongQing, CN;
Fei Ji, ChongQing, CN;
Chengcheng Li, ChongQing, CN;
Yongsan Liu, ChongQing, CN;
Liangwei Li, ChongQing, CN;
Fengyuan Qin, ChongQing, CN;
Runzhe Zhang, ChongQing, CN;
CCTEG Chongqing Research Institute Co., Ltd., Chongqing, CN;
Abstract
The present invention relates to a high pressure water jet automatic drilling and cutting collaborative system and method for coal seams, and belongs to the field of coal seam gas control. The system comprises a drilling and cutting collaborative control platform, an automatically regulated slotting pump unit and an automatically regulated drill; the drilling and cutting collaborative control platform comprises a coalbed gas geology management system, a decision analysis system, a drilling and cutting collaborative execution system, a monitoring and feedback system, and an information management and evaluation system; construction operation parameter instructions issued by the drilling and cutting collaborative control platform are executed by the automatically regulated slotting pump unit and the automatically regulated drill; coal seam geological information is recorded by the coalbed gas geology management system, and reasonable drilling and cutting construction parameters are analyzed and formulated by the decision analysis system based on the coal seam geological information. Drilling and cutting collaborative construction, on-site operation construction parameter monitoring, and real-time feedback and adjustment are realized by the drilling and cutting collaborative execution system and the monitoring feedback system according to the operation parameter instructions. Coal seam outburst prevention and control effects in a drilling and cutting collaborative implementation area is evaluated by the information management and evaluation system. The present invention improves safety of on-site operators, and reduces personnel input and labor intensity.
Data source: USPTO (United States Patent and Trademark Office) public patent records. Weekly synchronization. How IDiyas builds this profile