The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Jan. 28, 2025
Filed:
Jun. 27, 2020
Intel Corporation, Santa Clara, CA (US);
Bin Li, Portland, OR (US);
Ren Wang, Portland, OR (US);
Kshitij Arun Doshi, Tempe, AZ (US);
Francesc Guim Bernat, Barcelona, ES;
Yipeng Wang, Portland, OR (US);
Ravishankar Iyer, Portland, OR (US);
Andrew Herdrich, Hillsboro, OR (US);
Tsung-Yuan Tai, Portland, OR (US);
Zhu Zhou, Portland, OR (US);
Rasika Subramanian, Hillsboro, OR (US);
Intel Corporation, Santa Clara, CA (US);
Abstract
An apparatus and method for closed loop dynamic resource allocation. For example, one embodiment of a method comprises: collecting data related to usage of a plurality of resources by a plurality of workloads over one or more time periods, the workloads including priority workloads associated with one or more guaranteed performance levels and best effort workloads not associated with guaranteed performance levels; analyzing the data to identify resource reallocations from one or more of the priority workloads to one or more of the best effort workloads in one or more subsequent time periods while still maintaining the guaranteed performance levels; reallocating the resources from the priority workloads to the best effort workloads for the subsequent time periods; monitoring execution of the priority workloads with respect to the guaranteed performance level during the subsequent time periods; and preemptively reallocating resources from the best effort workloads to the priority workloads during the subsequent time periods to ensure compliance with the guaranteed performance level and responsive to detecting that the guaranteed performance level is in danger of being breached.