The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 17, 2018

Filed:

Dec. 31, 2014
Applicant:

General Electric Company, Schenectady, NY (US);

Inventors:

Lisa Anne Wichmann, Marietta, GA (US);

Achalesh Kumar Pandey, San Ramon, CA (US);

Eric Thomas Pool, Roswell, GA (US);

Christopher Michael Raczynski, Marietta, GA (US);

Suresh Pamujula, Marietta, GA (US);

Assignee:

General Electric Company, Schenectady, NY (US);

Attorneys:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G05D 3/12 (2006.01); G05D 5/00 (2006.01); G05D 9/00 (2006.01); G05D 11/00 (2006.01); G05D 17/00 (2006.01); F01K 13/02 (2006.01); G05B 13/04 (2006.01); F01K 23/10 (2006.01); F02C 6/00 (2006.01); G05F 1/66 (2006.01); F02C 9/28 (2006.01);
U.S. Cl.
CPC ...
F01K 13/02 (2013.01); F01K 23/101 (2013.01); F02C 6/00 (2013.01); F02C 9/28 (2013.01); G05B 13/04 (2013.01); G05F 1/66 (2013.01); F05D 2220/32 (2013.01); F05D 2220/72 (2013.01); F05D 2260/80 (2013.01); F05D 2270/053 (2013.01); F05D 2270/709 (2013.01); Y02E 20/16 (2013.01);
Abstract

A control method for optimizing or enhancing an operation of a power plant that includes thermal generating units for generating electricity. The power plant may include multiple possible operating modes differentiated by characteristics of operating parameters. The method may include tuning a power plant model so to configure a tuned power plant model. The method may further include simulating proposed operating modes of the power plant with the tuned power plant model. The simulating may include a simulation procedure that includes: defining a second operating period; selecting the proposed operating modes from the possible operating modes; with the tuned power plant model, performing a simulation run for each of the proposed operating modes whereby the operation of the power plant during the second operating period is simulated; and obtaining simulation results from each of the simulation runs.