The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 06, 2018

Filed:

Mar. 03, 2015
Applicant:

Halliburton Energy Services, Inc., Houston, TX (US);

Inventors:

Amin Mehrabian, Houston, TX (US);

Sorin Gabriel Teodorescu, The Woodlands, TX (US);

Dale E. Jamison, Humble, TX (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G06G 7/48 (2006.01); E21B 21/08 (2006.01); E21B 44/00 (2006.01); E21B 47/06 (2012.01); E21B 21/10 (2006.01); E21B 34/02 (2006.01); E21B 41/00 (2006.01); G05B 13/04 (2006.01);
U.S. Cl.
CPC ...
E21B 21/08 (2013.01); E21B 21/106 (2013.01); E21B 34/02 (2013.01); E21B 41/0092 (2013.01); E21B 44/00 (2013.01); E21B 47/06 (2013.01); E21B 47/065 (2013.01); G05B 13/048 (2013.01);
Abstract

A managed pressure drilling (MPD) operation may use an inverse model in conjunction with a hydraulic model and real-time drilling conditions and parameters as inputs to determine a wellhead pressure set point corresponding to a desired bottomhole pressure. For example, while drilling a wellbore penetrating a subterranean formation with a drilling system, measured data including a wellhead pressure may be acquired. A model may then be executed that applies a hydraulic model to an a priori model estimate vector to produce predicted data; converts the measured data to a measured data vector; applies a randomized maximum likelihood algorithm to the a priori model estimate vector, the predicted data, and the measured data vector to produce an a posterioiri model estimates; and applies the hydraulic model to the a posterioiri model estimates to produce an a posteriori prediction and a calculated wellhead pressure set point corresponding to a desired bottomhole pressure.


Find Patent Forward Citations

Loading…