The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 13, 2018

Filed:

Jun. 10, 2014
Applicants:

Jiangsu Electric Power Company Nanjing Power Supply Company, Nanjing, CN;

State Grid Corporation of China, Beijing, CN;

Hohai University, Nanjing, CN;

Jiangsu Electric Power Company, Nanjing, CN;

Nanjing Hehai Technology Limited Company, Nanjing, CN;

China Electric Power Research Institute, Beijing, CN;

Inventors:

Kun Yu, Nanjing, CN;

Peifeng Shen, Nanjing, CN;

Xingying Chen, Nanjing, CN;

Tingji Chen, Nanjing, CN;

Kai Chen, Nanjing, CN;

Hong Zhu, Nanjing, CN;

Lei Wei, Nanjing, CN;

Jing Xiao, Nanjing, CN;

Chunning Wang, Nanjing, CN;

Jianguo Yao, Nanjing, CN;

Yingchen Liao, Nanjing, CN;

Min Cai, Nanjing, CN;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G05D 3/12 (2006.01); G05D 5/00 (2006.01); G05D 9/00 (2006.01); G05D 11/00 (2006.01); G05D 17/00 (2006.01); G05D 23/00 (2006.01); G05F 1/66 (2006.01); G06Q 10/04 (2012.01); G06Q 10/06 (2012.01); G06Q 50/06 (2012.01); G05B 15/02 (2006.01);
U.S. Cl.
CPC ...
G05F 1/66 (2013.01); G05B 15/02 (2013.01); G06Q 10/04 (2013.01); G06Q 10/06 (2013.01); G06Q 50/06 (2013.01); Y02E 40/76 (2013.01); Y04S 10/54 (2013.01); Y04S 10/545 (2013.01);
Abstract

smart power distribution system and a method to progressively dispatch the power is described. The method steps are all automatic and self-adaptive. The method can be executed in an unattended manner to automatically correlate real time data vs. historical data, planning data vs. operation data. Based on a long cycle periodical variation and short-term random variations in load, and taking into account the temporary load power supply and maintenance needs, a multi-stage progressive multiple time scales optimal dispatching method is developed, including the distributed power, micro-grids, energy storage devices, electric vehicles charge-discharge facility and other elements of the Intelligent power distribution systems, to achieve coordinated operation of the network, power, load resources to ensure a continuous safe and reliable smart power distribution system operated at high quality and efficiency.


Find Patent Forward Citations