The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 26, 2017

Filed:

Jan. 17, 2012
Applicants:

Hua Fan, Norcross, GA (US);

Jiyuan Fan, Duluth, GA (US);

Paul Backscheider, Mosman, AU;

John Douglas Mcdonald, Duluth, GA (US);

Inventors:

Hua Fan, Norcross, GA (US);

Jiyuan Fan, Duluth, GA (US);

Paul Backscheider, Mosman, AU;

John Douglas McDonald, Duluth, GA (US);

Assignee:

General Electric Company, Schenectady, NY (US);

Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
G05B 15/02 (2006.01); H02J 3/00 (2006.01); H02J 3/14 (2006.01); H02J 13/00 (2006.01); G06Q 10/06 (2012.01); G06Q 50/06 (2012.01); H02J 3/18 (2006.01);
U.S. Cl.
CPC ...
H02J 3/00 (2013.01); G06Q 10/06 (2013.01); G06Q 50/06 (2013.01); H02J 3/14 (2013.01); H02J 13/0006 (2013.01); H02J 3/18 (2013.01); H02J 13/0062 (2013.01); H02J 13/0075 (2013.01); Y02B 70/3225 (2013.01); Y02E 40/30 (2013.01); Y02E 40/74 (2013.01); Y04S 10/22 (2013.01); Y04S 20/222 (2013.01);
Abstract

In one embodiment, a system includes a coordinated distribution optimization (CDO) system. The CDO system includes a processor configured to coordinate execution of a plurality of independent electrical network applications. Each of the plurality of independent electrical network applications is configured to alter one or more operational parameters of a power grid based on one or more respective objectives and based on power grid operational data, and the execution of the plurality of independent electrical network applications is coordinated by the CDO system to block the power grid from entering an abnormal state. The CDO system further comprises a network interface configured to receive the power grid operational data from a controller of the power grid, and wherein the power grid operational data comprises current values for the one or more operational parameters of the power grid.


Find Patent Forward Citations

Loading…