The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Patent No.:

US 9851415 B1

PDF
Full Text
Expired
Date of Patent:
Dec. 26, 2017

Filed:

Jan. 30, 2015
Applicants:

North China Electric Power University, Beijing, CN;

State Grid Corporation of China (Sgcc), Beijing, CN;

State Grid Shanxi Changzhi Power Supply Company, Shanxi, CN;

Inventors:

Lei Dong, Shanxi, CN;

Ye Li, Shanxi, CN;

Aizhong Tian, Shanxi, CN;

Xiaoli Shen, Shanxi, CN;

Peng Liu, Shanxi, CN;

Chanqiong Wang, Shanxi, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G01R 31/00 (2006.01); G01R 31/40 (2014.01); G01R 31/02 (2006.01); G06F 17/50 (2006.01); G06F 11/30 (2006.01);
U.S. Cl.
CPC ...
G01R 31/40 (2013.01); G01R 31/021 (2013.01); G01R 31/025 (2013.01); G01R 31/027 (2013.01); G06F 17/5009 (2013.01); G06F 17/5036 (2013.01); G06F 2217/78 (2013.01); Y02E 60/76 (2013.01); Y04S 40/22 (2013.01);
Abstract

The disclosure relates to the crossing field between a power transmission of an ultra-high-voltage and a power system simulation, specifically a method for analyzing an operation state of a substation by combining a whole grid model with a local grid model is provided according to the disclosure. The method includes following steps: performing a load flow calculation for the provincial grid to which a ultra-high-voltage line belongs, wherein initial data of the load flow calculation employs a grid model with E format for national power grid dispatching control center; making an equivalent transform for the model, forming an island independently from the provincial grid to which a ultra-high-voltage line belongs, and making a load flow calculation for the island to acquire data of node voltages and line transmission power.