The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 14, 2017

Filed:

Oct. 29, 2013
Applicant:

Mitsubishi Electric Corporation, Tokyo, JP;

Inventors:

Shota Kamiya, Tokyo, JP;

Kazunori Hatakeyama, Tokyo, JP;

Norikazu Ito, Tokyo, JP;

Kenta Yuasa, Tokyo, JP;

Shoji Isoda, Tokyo, JP;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F25B 21/02 (2006.01); H02M 7/217 (2006.01); H02M 3/158 (2006.01); H02M 1/32 (2007.01); H02M 1/42 (2007.01); F25B 31/02 (2006.01); H02M 7/06 (2006.01); H02M 1/36 (2007.01); H02M 1/08 (2006.01); H02M 1/12 (2006.01); H02M 1/00 (2006.01);
U.S. Cl.
CPC ...
F25B 31/02 (2013.01); H02M 1/08 (2013.01); H02M 1/12 (2013.01); H02M 1/32 (2013.01); H02M 1/36 (2013.01); H02M 1/42 (2013.01); H02M 1/4225 (2013.01); H02M 3/158 (2013.01); H02M 7/06 (2013.01); H02M 7/062 (2013.01); H02M 7/217 (2013.01); H02M 2001/007 (2013.01); H02M 2001/0009 (2013.01); Y02B 70/126 (2013.01);
Abstract

A DC power-supply device that suppresses an excessive inrush current, can prevent breakage of elements and burnout of circuits, and converts alternating current from a three-phase AC power supply into direct current to supply it to a load, includes a rectifier circuit having a reactor connected to input or output side thereof and rectifying the alternating current from the three-phase AC power supply; first and second capacitors and connected in series between output terminals to the load; a charging unit selectively charges one or both of the first and second capacitors; and a control unit controlling the charging unit. When charging of the first and second capacitors is started, the control unit reduces the on-duty ratio, and then, until the on-duty ratio during a normal operation is reached, the control unit executes control such that the on-duty ratio is gradually increased as a predetermined time period is passed.


Find Patent Forward Citations

Loading…