The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 14, 2017

Filed:

Dec. 08, 2015
Applicant:

Toyota Jidosha Kabushiki Kaisha, Toyota-shi, Aichi-ken, JP;

Inventors:

Sunao Horitake, Toyota, JP;

Yasuharu Terada, Toyota, JP;

Hiroshi Nate, Toyota, JP;

Takeaki Suzuki, Susono, JP;

Michihiro Miyashita, Susono, JP;

Kazuhito Eshima, Susono, JP;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B60L 3/00 (2006.01); B60L 11/18 (2006.01); B60W 10/26 (2006.01); H02J 7/00 (2006.01); H02J 7/14 (2006.01); B60R 16/033 (2006.01);
U.S. Cl.
CPC ...
B60L 11/1809 (2013.01); B60L 11/1851 (2013.01); B60L 11/1861 (2013.01); B60R 16/033 (2013.01); B60W 10/26 (2013.01); H02J 7/0026 (2013.01); H02J 7/1423 (2013.01);
Abstract

A power supply apparatus includes a first battery, a second battery, and an ECU configured to determine whether the following conditions i), ii), and iii) are satisfied: i) a degree of deterioration of the second battery is lower than a first threshold; ii) a state-of-charge of the second battery is lower than a second threshold; and iii) the state-of-charge is equal to or higher than a third threshold. The second threshold is higher by a prescribed value than a lowest allowable value of the state-of-charge at which the second battery can function as a backup power supply. The third threshold corresponds to the lowest allowable value. When determining that the conditions i), ii) and iii) are all satisfied, the ECU executes single-battery-using control in which regeneration control using the regenerative electric power is executed with use of the first battery and the second battery is not used for regeneration control.


Find Patent Forward Citations

Loading…