The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 17, 2017

Filed:

Jun. 17, 2013
Applicants:

Robert Bosch Gmbh, Stuttgart, DE;

Samsung Sdi Co., Ltd., Yongin-si, Gyeonggi-do, KR;

Inventor:

Holger Fink, Stuttgart, DE;

Assignees:

Robert Bosch GmbH, Stuttgart, DE;

Samsung SDI Co., Ltd., Yongin-si, Gyeonggi-do, KR;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H01M 2/00 (2006.01); H01M 10/48 (2006.01); H01M 10/42 (2006.01); H02J 7/00 (2006.01); G01R 31/36 (2006.01); H01M 2/34 (2006.01); B60L 11/18 (2006.01); B60L 3/00 (2006.01); B60L 3/04 (2006.01); H01M 2/20 (2006.01);
U.S. Cl.
CPC ...
H01M 10/4257 (2013.01); B60L 3/0046 (2013.01); B60L 3/04 (2013.01); B60L 11/1805 (2013.01); B60L 11/1851 (2013.01); B60L 11/1866 (2013.01); B60L 11/1872 (2013.01); G01R 31/362 (2013.01); G01R 31/3658 (2013.01); H01M 2/206 (2013.01); H01M 2/34 (2013.01); H01M 10/482 (2013.01); H02J 7/007 (2013.01); H02J 7/0021 (2013.01); H02J 7/0026 (2013.01); H02J 7/0029 (2013.01); B60L 2240/547 (2013.01); B60L 2240/549 (2013.01); B60L 2250/10 (2013.01); B60L 2270/20 (2013.01); H01M 2010/4271 (2013.01); H01M 2200/00 (2013.01); H01M 2220/20 (2013.01); H02J 2007/0039 (2013.01); Y02T 10/7005 (2013.01); Y02T 10/7061 (2013.01);
Abstract

A battery management system includes at least one cell monitoring unit with a plurality of cell voltage terminals, supply lines coupled to the cell voltage terminals, and a cell monitoring circuit made of a plurality of electronic semiconductor modules connected in parallel via the supply lines. The battery management system is configured to monitor a plurality of battery cells via the cell monitoring unit. The battery cells are in each case connected on both sides with their respective positive battery cell terminal and negative battery cell terminal to the battery management system via the cell voltage terminals. Furthermore, one or several supply lines are provided with a melt fuse so that in each battery cell that is connected to the battery management system at least one supply line coupled to the battery cell comprises a melt fuse in its current path.


Find Patent Forward Citations

Loading…