The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 10, 2017

Filed:

Feb. 06, 2014
Applicant:

Mitsubishi Electric Corporation, Chiyoda-ku, JP;

Inventors:

Takaya Yamamoto, Chiyoda-ku, JP;

Yoshitaka Uno, Chiyoda-ku, JP;

Mio Motodani, Chiyoda-ku, JP;

Hiroshi Maitani, Chiyoda-ku, JP;

Osamu Nakajima, Chiyoda-ku, JP;

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F24F 11/00 (2006.01); G05B 13/02 (2006.01); G05D 23/19 (2006.01);
U.S. Cl.
CPC ...
F24F 11/006 (2013.01); F24F 11/00 (2013.01); F24F 11/0012 (2013.01); F24F 11/0015 (2013.01); F24F 11/0017 (2013.01); F24F 11/0076 (2013.01); G05B 13/026 (2013.01); G05D 23/1917 (2013.01); G05D 23/1932 (2013.01); F24F 2011/0026 (2013.01); F24F 2011/0047 (2013.01); F24F 2011/0061 (2013.01); F24F 2011/0063 (2013.01); F24F 2011/0064 (2013.01); F24F 2011/0075 (2013.01); Y02B 30/78 (2013.01);
Abstract

A heat load predictor predicts a change over time of a heat amount to be processed by air-conditioning equipment, an operation plan creator previously creates an operation plan of the air-conditioning equipment to reduce an evaluation index under a first restrictive condition that a total process heat load be maintained at a same level or within a range of a predetermined amount of difference and a room temperature be maintained within a predetermined comfortable temperature range, and an operation plan corrector corrects the operation plan during controlling the air-conditioning equipment based on the operation plan. If an actually measured temperature differs from a predicted temperature predicted by the operation plan creator at the time of creating the operation plan, the operation plan creator predicts a change over time of the temperature in the room, and corrects the operation plan to minimize the evaluation index under the first restrictive condition.


Find Patent Forward Citations

Loading…