The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 22, 2017

Filed:

Apr. 24, 2014
Applicant:

General Electric Company, Schenectady, NY (US);

Inventors:

Igor Berroteran Gil, Salem, VA (US);

Anthony Michael Klodowski, Hardy, VA (US);

David Smith, Daleville, VA (US);

Assignee:

General Electric Company, Schenectady, NY (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G01R 31/42 (2006.01); H02S 50/10 (2014.01); H02M 1/12 (2006.01); H02M 7/219 (2006.01); H02M 7/5387 (2007.01); H02H 3/05 (2006.01); G01R 31/34 (2006.01); H02H 7/10 (2006.01); H02H 3/20 (2006.01); H02H 3/18 (2006.01); F03D 17/00 (2016.01);
U.S. Cl.
CPC ...
G01R 31/42 (2013.01); H02M 1/126 (2013.01); H02M 7/219 (2013.01); H02M 7/5387 (2013.01); H02S 50/10 (2014.12); F03D 17/00 (2016.05); F05B 2220/706 (2013.01); G01R 31/34 (2013.01); H02H 3/05 (2013.01); H02H 3/18 (2013.01); H02H 3/20 (2013.01); H02H 7/10 (2013.01); Y02E 10/76 (2013.01);
Abstract

A method and apparatus for testing operability of a power converter with an existing power conversion assembly of a renewable energy system is disclosed. The method includes transferring a first pulse of energy from an existing power conversion assembly to a power filter of the power converter through first cells within a bridge circuit of the power converter. Another step includes determining a first current-voltage feedback associated with the first pulse. A next step includes transferring a second pulse of energy from the power filter to the existing power conversion assembly through second cells within the bridge circuit such that a portion of the first pulse moves back to the existing power conversion assembly. Another step includes determining a second current-voltage feedback associated with the second pulse. The first and second current-voltage feedbacks are compared with nominal tolerances of the power converter to ensure the power converter is operating properly.


Find Patent Forward Citations

Loading…