The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 08, 2017

Filed:

Jun. 25, 2014
Applicant:

Aisin Seiki Kabushiki Kaisha, Kariya-shi, Aichi, JP;

Inventors:

Koji Nunami, Obu, JP;

Takashi Iwaya, Obu, JP;

Hiroyuki Amano, Kariya, JP;

Masaki Kobayashi, Okazaki, JP;

Assignee:

AISIN SEIKI KABUSHIKI KAISHA, Kariya-Shi, Aichi, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F01L 1/34 (2006.01); F01L 1/24 (2006.01); F01L 1/344 (2006.01);
U.S. Cl.
CPC ...
F01L 1/24 (2013.01); F01L 1/344 (2013.01); F01L 1/3442 (2013.01); F01L 2001/3443 (2013.01); F01L 2001/34463 (2013.01); F01L 2001/34466 (2013.01); F01L 2001/34473 (2013.01); F01L 2001/34483 (2013.01); F01L 2250/02 (2013.01); F01L 2800/00 (2013.01);
Abstract

A valve opening/closing timing control device includes: an intermediate lock mechanism switchable between a locked state constraining a relative rotation phase to an intermediate locked phase, and an unlocked state releasing the constraint; a phase control unit controlling fluid supply to a retard chamber and fluid discharge from an advance chamber, or controlling fluid discharge from the retard chamber and fluid supply to the advance chamber, such that the lock member attains the intermediate locked phase; and a determination unit determining whether the lock member will attain the determination phase, when control has been performed to move the lock member toward a determination phase that has been set at a different position than the intermediate locked phase, after execution of control to either supply fluid to the retard chamber and discharge fluid from the advance chamber, or discharge fluid from the retard chamber and supply fluid to the advance chamber.


Find Patent Forward Citations

Loading…