The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 08, 2017

Filed:

Aug. 29, 2014
Applicant:

Robert Bosch Gmbh, Stuttgart, DE;

Inventors:

Thomas Rupp, Benningen am Neckar, DE;

Stefan Cermak, Vienna, AT;

Jens Werneth, Stuttgart, DE;

Assignee:

Robert Bosch GmbH, Stuttgart, DE;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B60R 16/03 (2006.01); B60L 3/00 (2006.01); B60L 3/04 (2006.01); B60L 11/18 (2006.01); G06F 1/28 (2006.01); G06F 11/07 (2006.01); H01M 10/48 (2006.01); G08C 17/00 (2006.01); H04Q 9/00 (2006.01); H01M 10/42 (2006.01); G01R 31/36 (2006.01);
U.S. Cl.
CPC ...
B60R 16/03 (2013.01); B60L 3/0084 (2013.01); B60L 3/0092 (2013.01); B60L 3/04 (2013.01); B60L 11/18 (2013.01); B60L 11/1816 (2013.01); G06F 1/28 (2013.01); G06F 11/0739 (2013.01); G06F 11/0751 (2013.01); G08C 17/00 (2013.01); H01M 10/48 (2013.01); H04Q 9/00 (2013.01); B60R 16/0315 (2013.01); G01R 31/3648 (2013.01); H01M 10/425 (2013.01); H01M 2220/20 (2013.01); H04Q 2209/30 (2013.01); Y02T 10/7005 (2013.01); Y02T 10/7072 (2013.01); Y02T 90/14 (2013.01); Y02T 90/16 (2013.01);
Abstract

The invention relates to a method for monitoring a component (), in particular a battery, of a motor vehicle having a first control unit () for monitoring the component () and a second control unit () for monitoring the component (), wherein the second control unit () is arranged at a distance from the first control unit () and communicates with the first control unit (), wherein the second control unit () is connected to the component () via a line (), in particular a hardware line, comprising the steps of transmitting operating data to the first control unit () by means of the second control unit (), checking the operating data in the first control unit (), transmitting data from the first control unit () to the second control unit (), switching off the component () by means of the second control unit () if interference is detected by means of the first control unit () and/or the second control unit (). The invention makes possible spatial separation of the control unit to be tested from the control unit carrying out the switching off, wherein the installation position of the control unit to be tested can be selected freely.


Find Patent Forward Citations

Loading…