The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 13, 2017

Filed:

Nov. 03, 2012
Applicant:

Alstom Technology, Ltd., Baden, CH;

Inventors:

Ewald Kitzmann, Weinheim, DE;

Volker Schüle, Leimen, DE;

Julia Heintz, Gernsheim, DE;

Angie Ewert, Mannheim, DE;

Assignee:
Attorneys:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F01K 13/02 (2006.01); F01K 23/10 (2006.01); F01K 25/08 (2006.01); F01K 7/22 (2006.01); F01K 13/00 (2006.01); F01K 7/40 (2006.01); F02C 6/18 (2006.01); F24J 2/07 (2006.01); F24J 2/42 (2006.01); F03G 6/06 (2006.01); F22B 1/00 (2006.01); F22B 1/18 (2006.01); F01K 7/42 (2006.01); F01K 7/44 (2006.01); F01K 3/00 (2006.01); F03G 7/04 (2006.01); F01K 3/16 (2006.01);
U.S. Cl.
CPC ...
F01K 3/00 (2013.01); F01K 3/004 (2013.01); F01K 3/16 (2013.01); F01K 7/22 (2013.01); F01K 7/40 (2013.01); F01K 7/42 (2013.01); F01K 7/44 (2013.01); F01K 13/00 (2013.01); F01K 13/02 (2013.01); F01K 23/10 (2013.01); F01K 23/101 (2013.01); F01K 23/106 (2013.01); F01K 25/08 (2013.01); F02C 6/18 (2013.01); F03G 6/065 (2013.01); F03G 7/04 (2013.01); F22B 1/006 (2013.01); F22B 1/1815 (2013.01); F24J 2/07 (2013.01); F24J 2/42 (2013.01); Y02E 10/14 (2013.01); Y02E 10/16 (2013.01); Y02E 10/46 (2013.01); Y02P 20/129 (2015.11);
Abstract

A steam power plant is suggested having, parallel to the high-pressure preheater passage (VWto VW), a heat reservoir (A) which is loaded with preheated condensate in weak-load times. This preheated condensate is taken from the heat reservoir (A) for generating peak-load and inserted downstream of the high-pressure preheater passage (VWto VW) into the condensate line () resp. the feed water container (). Thus it is possible to quickly control the power generation of the power plant in a wide range without significantly having to change the heating output of the boiler of the steam generator (). A steam power plant equipped according to the invention can thus be operated with bigger load modifications and also provide more control energy.


Find Patent Forward Citations

Loading…