The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 02, 2017

Filed:

May. 28, 2014
Applicant:

Weatherford Technology Holdings, Llc, Houston, TX (US);

Inventors:

Richard L. Giroux, Cypress, TX (US);

Gregory G. Galloway, Conroe, TX (US);

Patrick G. Maguire, Cypress, TX (US);

Tuong Thanh Le, Katy, TX (US);

Albert C. Odell, II, Kingwood, TX (US);

David M. Haugen, Pacific Grove, CA (US);

Frederick T. Tilton, Spring, TX (US);

Brent J. Lirette, Cypress, TX (US);

David J. Brunnert, Cypress, TX (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
E21B 7/20 (2006.01); E21B 4/02 (2006.01); E21B 17/07 (2006.01); E21B 21/00 (2006.01); E21B 21/08 (2006.01); E21B 21/10 (2006.01); E21B 33/14 (2006.01); E21B 43/10 (2006.01);
U.S. Cl.
CPC ...
E21B 7/20 (2013.01); E21B 4/02 (2013.01); E21B 7/203 (2013.01); E21B 17/07 (2013.01); E21B 21/00 (2013.01); E21B 21/08 (2013.01); E21B 21/103 (2013.01); E21B 33/14 (2013.01); E21B 33/143 (2013.01); E21B 43/10 (2013.01); E21B 2021/006 (2013.01);
Abstract

The present invention relates methods and apparatus for lining a wellbore. In one aspect, a drilling assembly having an earth removal member and a wellbore lining conduit is manipulated to advance into the earth. The drilling assembly includes a first fluid flow path and a second fluid flow path. Fluid is flowed through the first fluid flow path, and at least a portion of which may return through the second fluid flow path. In one embodiment, the drilling assembly is provided with a third fluid flow path. After drilling has been completed, wellbore lining conduit may be cemented in the wellbore.


Find Patent Forward Citations

Loading…