The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 07, 2016

Filed:

Jul. 16, 2009
Applicants:

Véronique Bonnelye, Conflans, FR;

Eric Fievez, Suresnes, FR;

Inventors:

Véronique Bonnelye, Conflans, FR;

Eric Fievez, Suresnes, FR;

Assignee:

DEGREMONT, , FR;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B01D 35/00 (2006.01); B01D 63/00 (2006.01); G05B 13/02 (2006.01); B01D 61/02 (2006.01); B01D 61/04 (2006.01); B01D 61/06 (2006.01); B01D 61/10 (2006.01); B01D 61/12 (2006.01); B01D 61/58 (2006.01); B01D 65/02 (2006.01); C02F 1/44 (2006.01); B01D 61/14 (2006.01); C02F 1/00 (2006.01); C02F 103/08 (2006.01);
U.S. Cl.
CPC ...
G05B 13/0205 (2013.01); B01D 61/025 (2013.01); B01D 61/04 (2013.01); B01D 61/06 (2013.01); B01D 61/10 (2013.01); B01D 61/12 (2013.01); B01D 61/58 (2013.01); B01D 65/02 (2013.01); C02F 1/441 (2013.01); B01D 61/145 (2013.01); B01D 2311/10 (2013.01); B01D 2311/14 (2013.01); B01D 2311/16 (2013.01); B01D 2311/246 (2013.01); B01D 2311/2649 (2013.01); B01D 2321/16 (2013.01); C02F 1/008 (2013.01); C02F 2103/08 (2013.01); C02F 2209/02 (2013.01); C02F 2209/03 (2013.01); C02F 2209/05 (2013.01); C02F 2209/40 (2013.01); C02F 2303/10 (2013.01); Y02W 10/30 (2015.05);
Abstract

The invention relates to a reverse-osmosis water desalination plant comprising: a reverse-osmosis membrane unit (TP); at least one high-pressure pump (HP); a pressure-exchange-type energy collector (SRE) capable of transferring pressure from the concentrate leaving the membrane unit to a portion of the water to be treated; sensors for various operating parameters, in particular pressure, flow rate, temperature and salinity level, said sensors being provided at suitable locations; and control loops so that the various adjustable elements are maintained at a setpoint value. The plant also includes a secondary control system (D) comprising calculation means () programmed to determine, on the basis of the operating conditions of the plant supplied by the sensors, a combination of setpoint values for the flow rate of the high-pressure pump, the mixing ratio of the energy collector and the conversion ratio, which combination minimizes the energy consumption of the high-pressure pump.


Find Patent Forward Citations

Loading…