The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 10, 2016

Filed:

Aug. 05, 2011
Applicants:

Pannalal Vimalchand, Birmingham, AL (US);

Guohai Liu, Birmingham, AL (US);

Wanwang Peng, Birmingham, AL (US);

Inventors:

Pannalal Vimalchand, Birmingham, AL (US);

Guohai Liu, Birmingham, AL (US);

Wanwang Peng, Birmingham, AL (US);

Assignee:

SOUTHERN COMPANY, Birmingham, AL (US);

Attorneys:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F22B 1/18 (2006.01); F28D 21/00 (2006.01); F23C 10/24 (2006.01); F23J 1/02 (2006.01); C10J 3/52 (2006.01); C10J 3/76 (2006.01); C10K 1/02 (2006.01); F28D 7/12 (2006.01); F28D 13/00 (2006.01);
U.S. Cl.
CPC ...
F28D 21/001 (2013.01); C10J 3/523 (2013.01); C10J 3/76 (2013.01); C10K 1/022 (2013.01); C10K 1/024 (2013.01); F23C 10/24 (2013.01); F23J 1/02 (2013.01); F28D 7/12 (2013.01); F28D 13/00 (2013.01); C10J 2300/093 (2013.01); C10J 2300/1625 (2013.01); C10J 2300/1861 (2013.01); C10J 2300/1892 (2013.01); F23C 2900/10006 (2013.01); F23J 2900/01002 (2013.01); F28D 2021/0045 (2013.01);
Abstract

Disclosed are cooling and depressurization system equipment, arrangement and methods to cool solid particles from a coal gasifier operating at high temperature and pressure. Ash needs to be continuously withdrawn from a circulating fluidized bed gasifier to maintain the solids inventory in the gasifier. The supports for the cooling surfaces are located on the lower temperature upper section of the primary cooler. The cooled solids along with the fluidizing gas exits the primary cooler to a secondary receiving vessel where the solids can be further cooled by conventional means. The fluidizing and entrained gas entering the secondary vessel is filtered and vented through a vent pressure control valve. The column of cooled solids in the secondary vessel is depressurized by a continuous depressurization system to low pressures which are sufficient for conveying the solids to silos for disposal.


Find Patent Forward Citations

Loading…