The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Dec. 29, 2015

Filed:

Apr. 07, 2010
Applicant:

Marc Peters, Freiburg, DE;

Inventor:

Marc Peters, Freiburg, DE;

Assignee:

Herrenknecht AG, Schwanau, DE;

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E02D 7/00 (2006.01); E02D 7/20 (2006.01); E02D 7/16 (2006.01); E02D 7/26 (2006.01); E02D 7/28 (2006.01); E02D 13/04 (2006.01); E02D 27/52 (2006.01);
U.S. Cl.
CPC ...
E02D 7/20 (2013.01); E02D 7/16 (2013.01); E02D 7/26 (2013.01); E02D 7/28 (2013.01); E02D 13/04 (2013.01); E02D 27/52 (2013.01);
Abstract

The invention relates to a method and a device for creating an underwater foundation of a building, wherein a base element is provided as a module carrier () at the erection site and a pile () forms the foundation to be created or is a component of the foundation, wherein the pile () is implemented as a hollow body. The aim of the invention is to allow the creation of a foundation in geologically difficult conditions, while simultaneously reducing noise emissions in sensitive areas. The aim is achieved by clamping the pile () in a pivot module (), by erecting the pile () by way of pivoting the pivot module (), until the desired driving direction into the ground () relative to the horizontal is achieved, by locking the pivot module after erecting the desired slope, by sinking the pile () to the floor () of the water system () and pressing it into the floor () until a limit value of a driving force is reached, by installing a sinking device () in the pile () and sinking it to the floor (), by loosening the rock () below the pile () and sinking the pile () until the final depth is reached.


Find Patent Forward Citations

Loading…