The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 17, 2015

Filed:

Dec. 20, 2012
Applicant:

Mitsubishi Electric Corporation, Chiyoda-ku, Tokyo, JP;

Inventors:

Shogo Tamaki, Tokyo, JP;

Fumitake Unezaki, Tokyo, JP;

Kazuyoshi Shinozaki, Cypress, CA (US);

Tomohiko Kasai, Cypress, CA (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F25B 45/00 (2006.01); F25B 13/00 (2006.01); F25B 49/02 (2006.01);
U.S. Cl.
CPC ...
F25B 45/00 (2013.01); F25B 13/00 (2013.01); F25B 49/022 (2013.01); F25B 2313/006 (2013.01); F25B 2313/0231 (2013.01); F25B 2313/0233 (2013.01); F25B 2313/02741 (2013.01); F25B 2313/0311 (2013.01); F25B 2313/0314 (2013.01); F25B 2313/0315 (2013.01); F25B 2345/001 (2013.01); F25B 2345/003 (2013.01); F25B 2400/13 (2013.01); F25B 2500/19 (2013.01); F25B 2500/23 (2013.01); F25B 2500/24 (2013.01); F25B 2600/0253 (2013.01); F25B 2600/05 (2013.01); F25B 2700/1931 (2013.01); F25B 2700/1933 (2013.01); F25B 2700/2103 (2013.01); F25B 2700/2104 (2013.01); F25B 2700/2106 (2013.01); F25B 2700/21152 (2013.01); Y02B 30/741 (2013.01);
Abstract

Operation data of a refrigerant circuit is acquired after an initial refrigerant charge amount of refrigerant is charged in the refrigerant circuit and operation of the refrigerant circuit is started, an internal volume of a high-pressure pipeis computed from the obtained operation data and the initial refrigerant charge amount input in a input unit, a target refrigerant charge amount is computed from the computed internal volume of the high-pressure pipeand a standard operating state acquired in advance, the standard operating state being operation data of the refrigerant circuit when the refrigerant circuit is in a standard operating state that satisfies a preset condition, and an additional refrigerant charge amount is computed from the target refrigerant charge amount and the initial refrigerant charge amount.


Find Patent Forward Citations

Loading…