The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Sep. 22, 2015

Filed:

Mar. 14, 2013
Applicants:

Xiaotong Wei, Mountain View, CA (US);

Richard W Baker, Palo Alto, CA (US);

Timothy C Merkel, Menlo Park, CA (US);

Brice C. Freeman, Menlo Park, CA (US);

Inventors:

Xiaotong Wei, Mountain View, CA (US);

Richard W Baker, Palo Alto, CA (US);

Timothy C Merkel, Menlo Park, CA (US);

Brice C. Freeman, Menlo Park, CA (US);

Assignee:
Attorneys:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B01D 53/22 (2006.01); F02C 7/00 (2006.01); H02K 7/18 (2006.01); B01D 53/62 (2006.01); F02C 3/34 (2006.01); F23C 9/00 (2006.01); F23J 15/02 (2006.01); F23L 7/00 (2006.01); B01D 53/14 (2006.01);
U.S. Cl.
CPC ...
F02C 7/00 (2013.01); B01D 53/22 (2013.01); B01D 53/62 (2013.01); F02C 3/34 (2013.01); F23C 9/00 (2013.01); F23J 15/02 (2013.01); F23L 7/007 (2013.01); H02K 7/1823 (2013.01); B01D 53/1475 (2013.01); B01D 2251/306 (2013.01); B01D 2251/606 (2013.01); B01D 2252/10 (2013.01); B01D 2252/20478 (2013.01); B01D 2256/22 (2013.01); B01D 2257/102 (2013.01); B01D 2257/104 (2013.01); B01D 2257/504 (2013.01); B01D 2258/0283 (2013.01); F23J 2215/50 (2013.01); F23L 2900/07001 (2013.01); Y02C 10/04 (2013.01); Y02C 10/10 (2013.01); Y02E 20/16 (2013.01); Y02E 20/18 (2013.01); Y02E 20/322 (2013.01); Y02E 20/344 (2013.01);
Abstract

A process involving membrane-based gas separation and power generation, specifically for controlling carbon dioxide emissions from gas-fired power plants. The process includes a compression step, a combustion step, and an expansion/electricity generation step, as in traditional power plants. The process also includes a sweep-driven membrane separation step and a carbon dioxide removal or capture step. The carbon dioxide removal step is carried out on a portion of gas from the compression step.


Find Patent Forward Citations

Loading…