The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Sep. 15, 2015

Filed:

Apr. 04, 2012
Applicants:

Frederick B. Slota, Aberdeen, SD (US);

Erran Kagan, Great Neck, NY (US);

Inventors:

Frederick B. Slota, Aberdeen, SD (US);

Erran Kagan, Great Neck, NY (US);

Assignee:

Electro Industries/Gauge Tech, Westbury, NY (US);

Attorneys:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G05B 23/02 (2006.01); H02J 3/06 (2006.01); H02J 3/08 (2006.01); H02J 3/34 (2006.01); H02J 3/38 (2006.01); H02J 3/40 (2006.01); H02J 3/42 (2006.01); H05B 37/02 (2006.01);
U.S. Cl.
CPC ...
H02J 3/42 (2013.01); H02J 3/08 (2013.01); H02J 3/34 (2013.01); H02J 3/38 (2013.01); H02J 3/40 (2013.01); G05B 23/02 (2013.01); H02J 3/06 (2013.01); H05B 37/0272 (2013.01); Y10T 307/735 (2015.04);
Abstract

Systems and method for synchronizing power generators with a power grid are provided. One system among various implementations includes a plurality of synchronization modules, wherein each synchronization module corresponds to one power generator. The synchronization modules are configured to output a control signal to adjust a frequency of the respective power generator to correspond with the frequency of the existing power grid. The system also includes a central controller in communication with the plurality of synchronization modules. The central controller is configured to determine a propagation delay with respect to each synchronization module. The propagation delay is a measure of time for a signal to propagate from the respective synchronization module to the central controller. The central controller is further configured to send a control signal to each synchronization module to control when each synchronization module connects the respective power generator to the existing power grid.


Find Patent Forward Citations

Loading…