The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Sep. 01, 2015

Filed:

Sep. 07, 2012
Applicants:

Katsuya Yokokawa, Tokyo, JP;

Ryo Namba, Kanagawa-ken, JP;

Takeshi Matsushiro, Kanagawa-ken, JP;

Hideaki Yamagata, Chiba-ken, JP;

Futoshi Kurokawa, Tokyo, JP;

Inventors:

Katsuya Yokokawa, Tokyo, JP;

Ryo Namba, Kanagawa-ken, JP;

Takeshi Matsushiro, Kanagawa-ken, JP;

Hideaki Yamagata, Chiba-ken, JP;

Futoshi Kurokawa, Tokyo, JP;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G05D 9/00 (2006.01); C02F 1/44 (2006.01); C02F 1/00 (2006.01); G05B 13/02 (2006.01); C02F 103/08 (2006.01);
U.S. Cl.
CPC ...
C02F 1/441 (2013.01); C02F 1/008 (2013.01); G05B 13/026 (2013.01); C02F 2103/08 (2013.01); C02F 2209/001 (2013.01); C02F 2209/006 (2013.01); C02F 2209/02 (2013.01); C02F 2209/40 (2013.01); C02F 2209/42 (2013.01); C02F 2303/10 (2013.01); C02F 2303/24 (2013.01); G05B 2219/32018 (2013.01); Y02W 10/30 (2015.05);
Abstract

According to one embodiment, a seawater desalination plant system includes a plant unit that produces fresh water from seawater. The seawater desalination plant system predicts quality of seawater for each predetermined time (for example, 1 hour) for a certain definite period (for example, 24 hours) based on a past actual measurement value of quality of seawater; creates a plurality of proposed plans of fresh water production quantity during the definite period in each of which fresh water production quantity required for the definite period is allotted to the each predetermined time; calculates, with respect to the proposed plans, electric power consumption rates for desalination using the predicted quality of seawater, the fresh water production quantity and a previously obtained recovery rate; and obtains an optimum plan of fresh water production quantity with a minimum electric power consumption rate from the proposed plans.


Find Patent Forward Citations

Loading…