The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
May. 26, 2015

Filed:

Mar. 25, 2008
Applicant:

Timothy Andrew Healy, Simpsonville, SC (US);

Inventor:

Timothy Andrew Healy, Simpsonville, SC (US);

Assignee:

General Electric Company, Schenectady, NY (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
F02C 9/00 (2006.01); F01D 17/00 (2006.01); F02C 9/22 (2006.01); F02C 9/26 (2006.01); F02C 9/28 (2006.01); G05B 13/04 (2006.01);
U.S. Cl.
CPC ...
F02C 9/00 (2013.01); F01D 17/00 (2013.01); F02C 9/22 (2013.01); F02C 9/26 (2013.01); F02C 9/28 (2013.01); F05D 2270/71 (2013.01); G05B 13/041 (2013.01); F05D 2270/44 (2013.01); F05D 2270/31 (2013.01); F05D 2270/54 (2013.01); F05D 2270/3011 (2013.01); F05D 2270/3013 (2013.01); F05D 2270/303 (2013.01);
Abstract

Embodiments of systems and methods for tuning a turbine are provided. In one embodiment, a method may include receiving at least one of a measured operating parameter or a modeled operating parameter of a turbine during operation; and tuning the turbine during operation. The turbine may be tuned during operation by applying the measured operating parameter or modeled operating parameter or parameters to at least one operational boundary model, applying the measured operating parameter or modeled operating parameter or parameters to at least one scheduling algorithm, comparing the output of the operational boundary model or models to the output of the scheduling algorithm or algorithms to determine at least one error term, and closing loop on the one error term or terms by adjusting at least one turbine control effector during operation of the turbine.


Find Patent Forward Citations

Loading…