The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 24, 2015

Filed:

Nov. 30, 2007
Applicants:

Dachuan Yu, Peoria, IL (US);

Michael Parry Liechty, Chillicothe, IL (US);

Mahesh Sitaram Illindala, Dunlap, IL (US);

Matthew Thomas Muller, Peoria, IL (US);

Inventors:

Dachuan Yu, Peoria, IL (US);

Michael Parry Liechty, Chillicothe, IL (US);

Mahesh Sitaram Illindala, Dunlap, IL (US);

Matthew Thomas Muller, Peoria, IL (US);

Assignee:

Caterpillar Inc., Peoria, IL (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 3/46 (2006.01); H02J 3/28 (2006.01); H02J 3/38 (2006.01);
U.S. Cl.
CPC ...
H02J 3/46 (2013.01); H02J 3/28 (2013.01); H02J 3/383 (2013.01); H02J 3/386 (2013.01); H02J 3/382 (2013.01); Y02E 70/30 (2013.01); Y02E 10/563 (2013.01); Y02E 10/566 (2013.01); Y02E 10/763 (2013.01);
Abstract

A hybrid power system is disclosed. The hybrid power system may include a primary power source configured to provide a primary power, and an energy storage device coupled to the primary power source, the energy storage device configured to store excess primary power provided by the primary power source. The hybrid power system may further include a variable speed genset, the variable speed genset including a secondary power source configured to operate at a variable rotor speed to provide a secondary power responsive to power requirements of a load. The hybrid power system may also include a central controller communicatively coupled to the primary power source, the energy storage device, and the variable speed genset, the central controller configured to control the primary power source, the energy storage device, and the variable speed genset based on the power requirements of the load.


Find Patent Forward Citations

Loading…