The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 24, 2015

Filed:

May. 08, 2010
Applicants:

Jorge Octavio Becerra-novoa, Nuevo Leon, MX;

Ronald Victor Manuel Lopez-gomez, Nuevo Leon, MX;

Alessandro Martinis, Poz-zuolo del Friuli, IT;

Andrea Tavano, Tavagnacco, IT;

Inventors:

Jorge Octavio Becerra-Novoa, Nuevo Leon, MX;

Ronald Victor Manuel Lopez-Gomez, Nuevo Leon, MX;

Alessandro Martinis, Poz-zuolo del Friuli, IT;

Andrea Tavano, Tavagnacco, IT;

Assignees:

HYL Technologies, S.A. DE C.V., San Nicholas de los Garza, NL, MX;

Danieli & C. Officine Mecaniche, S.p.A., Buttrio, IT;

Attorneys:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
C21B 13/12 (2006.01); C21B 13/08 (2006.01); C21B 13/02 (2006.01); F27D 11/08 (2006.01); F27D 19/00 (2006.01); C21B 13/14 (2006.01); C21B 13/00 (2006.01); F27B 3/18 (2006.01);
U.S. Cl.
CPC ...
C21B 13/143 (2013.01); C21B 13/0086 (2013.01); C21B 13/02 (2013.01); F27B 3/18 (2013.01);
Abstract

An integrated steelmaking plant for merging continuous operation of a reduction reactor producing hot DRI with the batch operation of a DRI melting furnace(s). The reactor produces hot DRI for a DRI melting furnace or cold DRI continuously even when the DRI production exceeds the DRI consumption rate of the furnace or suffers long-term operational delays. The reduction reactor has a DRI cooling zone therein which is selectively operable for cooling DRI when the hot DRI produced in the reactor can't all be consumed by the DRI melting furnace and when the capacity of the DRI bin feeding the melting furnace is insufficient to accumulate additional hot DRI. No separate DRI cooling vessel plus its gas compressor and gas cooling-cleaning system is needed, thus decreasing capital and operational costs. This also permits a flexible and modular construction and operation of a steelmaking plant with high or low pressure reduction reactors.


Find Patent Forward Citations

Loading…