The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 06, 2015

Filed:

Jun. 29, 2011
Applicants:

Luis Marroyo Palomo, Pamplona, ES;

Javier Marcos Álvarez, Pamplona, ES;

María Asunción Padros Razquin, Sarriguren, ES;

Daniel Rabal Echeverria, Sarriguren, ES;

David Cuesta Lerín, Sarriguren, ES;

Iñigo Berazaluce Minondo, Sarriguren, ES;

Christopher Walti, Chicago, IL (US);

Inventors:

Luis Marroyo Palomo, Pamplona, ES;

Javier Marcos Álvarez, Pamplona, ES;

María Asunción Padros Razquin, Sarriguren, ES;

Daniel Rabal Echeverria, Sarriguren, ES;

David Cuesta Lerín, Sarriguren, ES;

Iñigo Berazaluce Minondo, Sarriguren, ES;

Christopher Walti, Chicago, IL (US);

Assignee:

Acciona Energia, S.A., Sarriguren, Navarra, ES;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05D 3/12 (2006.01); G06Q 50/06 (2012.01); G06Q 10/06 (2012.01); H02J 3/32 (2006.01); H02J 3/38 (2006.01); H02J 3/16 (2006.01); H02J 3/14 (2006.01);
U.S. Cl.
CPC ...
G06Q 50/06 (2013.01); G06Q 10/06 (2013.01); H02J 3/32 (2013.01); H02J 3/383 (2013.01); H02J 3/386 (2013.01); H02J 3/16 (2013.01); H02J 2003/146 (2013.01); Y02E 70/30 (2013.01); Y02E 10/563 (2013.01); Y02E 10/566 (2013.01); Y02E 10/763 (2013.01);
Abstract

A process for simultaneously providing capacity sale services (e.g. frequency regulation or voltage regulation), energy sale services (energy transfer from off-peak hours to peak hours), and stabilization services of a renewable plant may be provided. The process includes determining the values of energy quantity to be produced by the plant during a near future time interval. The process may also include introducing the values of energy quantity, in the control unit. Generating an hourly program of energy supply to be provided by the energy accumulator unit to the network may also be performed, depending on the values of energy to be produced, which stabilizes the power supplied by the plant to the network. Furthermore, the frequency and the voltage of the network may be regulated as well as transfers the energy between off-peak hours and peak hours, or from hours with saturation of the network to hours without saturation.


Find Patent Forward Citations

Loading…