The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Oct. 14, 2014

Filed:

Feb. 21, 2011
Applicants:

Motomichi Katou, Nara, JP;

Yoshikazu Tanaka, Shiga, JP;

Takanori Shimada, Shiga, JP;

Inventors:

Motomichi Katou, Nara, JP;

Yoshikazu Tanaka, Shiga, JP;

Takanori Shimada, Shiga, JP;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H01M 8/04 (2006.01);
U.S. Cl.
CPC ...
H01M 8/04955 (2013.01); Y02B 90/16 (2013.01); H01M 8/04992 (2013.01); Y02E 60/50 (2013.01); H01M 2250/405 (2013.01);
Abstract

Included are: a basic operation plan creating sectionconfigured to create a basic operation plan based on durable years (e.g., 10 years) and a durable operating time (e.g., 40000 hours) of a fuel cell, such that the fuel cellis operated within the range of at least one of a first allowable operating time (e.g., 11 hours) per predetermined unit period (e.g., per day) and the number of durable start-ups (e.g., 4000 times) per predetermined unit period; a special operation plan creating sectionconfigured to create a special operation plan such that the fuel cellis operated within the range of at least one of a second allowable operating time (e.g., 20 hours) per predetermined unit period (e.g., per day) and a second allowable number of start-ups per predetermined unit period, the second allowable operating time being longer than the first allowable operating time, the second allowable number of start-ups being greater than the first allowable number of start-ups; an operation plan selecting sectionconfigured to select one of the basic operation plan and the special operation plan; and a fuel cell operating sectionconfigured to operate the fuel cellbased on the operation plan selected by the operation plan selecting section


Find Patent Forward Citations

Loading…