The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Sep. 03, 2013

Filed:

Jun. 11, 2009
Applicants:

Robert T. Mason, Jr., Raleigh, NC (US);

Keith D. Richeson, Cary, NC (US);

Charlie E. Minton, Iii, Willow Spring, NC (US);

Inventors:

Robert T. Mason, Jr., Raleigh, NC (US);

Keith D. Richeson, Cary, NC (US);

Charlie E. Minton, III, Willow Spring, NC (US);

Assignee:

Elster Solutions, LLC, Raleigh, NC (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G08C 19/16 (2006.01); G08B 23/00 (2006.01); G05D 3/12 (2006.01); G05D 5/00 (2006.01); G05D 9/00 (2006.01); G05D 11/00 (2006.01); G05D 17/00 (2006.01); G01R 21/00 (2006.01); G01R 21/06 (2006.01);
U.S. Cl.
CPC ...
Abstract

An electricity meter capable of performing a method for limiting an electricity load in communication with the electricity meter is disclosed. The electricity meter includes at least one load control and the electricity meter has one or more predetermined time-of-use tiers. Each of the one or more predetermined time-of-use tiers has a corresponding time-of-use demand threshold. The method comprises determining a present time-of-use tier; determining a present time-of-use demand for the electricity load in the present time-of-use tier; comparing the present time-of-use demand to the time-of-use demand threshold corresponding to the present time-of-use tier; and setting the at least one load control to a de-energize mode when a de-energize condition is satisfied. The de-energize condition may include sub-conditions such as the present time-of-use demand exceeding the time-of-use demand threshold corresponding to the present time-of-use tier.


Find Patent Forward Citations

Loading…