The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 01, 2010

Filed:

Aug. 30, 2004
Applicants:

Ronald Richard Rayburn, Norman, OK (US);

Stephen Blake Pickle, Norman, OK (US);

John Terry Knight, Moore, OK (US);

Stephen Wayne Bellah, Oklahoma City, OK (US);

Anthony W. Landers, Yukon, OK (US);

Inventors:

Ronald Richard Rayburn, Norman, OK (US);

Stephen Blake Pickle, Norman, OK (US);

John Terry Knight, Moore, OK (US);

Stephen Wayne Bellah, Oklahoma City, OK (US);

Anthony W. Landers, Yukon, OK (US);

Assignee:
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F25B 49/00 (2006.01); F25B 7/00 (2006.01);
U.S. Cl.
CPC ...
Abstract

A humidity control method is provided for a multi-stage cooling system having two or more refrigerant circuits. A hot gas re-heat circuit having a hot gas re-heat coil, an evaporator and a compressor, such as the evaporator and compressor utilized in one of the refrigerant circuits, is provided. The hot gas re-heat coil is placed in fluid communication with the output airflow from the evaporator of the re-heat circuit. Humidity control is performed during cooling operations and ventilation operations. During a first stage cooling operation using only one refrigerant circuit and having a low cooling demand, the request for humidity control activates the hot gas re-heat circuit for dehumidification and activates a second refrigerant circuit to provide cooling capacity. During a second stage cooling operation using multiple refrigerant circuits and having a high cooling demand, the request for humidity control is suspended until completion of the second stage cooling demand.


Find Patent Forward Citations

Loading…