The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 06, 2010

Filed:

May. 28, 2004
Applicants:

Nobuki Matsui, Osaka, JP;

Masanobu Kawazoe, Osaka, JP;

Kazuo Yonemoto, Osaka, JP;

Inventors:

Nobuki Matsui, Osaka, JP;

Masanobu Kawazoe, Osaka, JP;

Kazuo Yonemoto, Osaka, JP;

Assignee:

Daikin Industries, Ltd., Osaka-shi, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G05D 22/02 (2006.01);
U.S. Cl.
CPC ...
Abstract

A humidity controller apparatus () contains an adsorption rotor () and a heater (). A first passage () along which a first air stream flows and a second passage () along which a second air stream flows are formed in the humidity controller apparatus (). The amount of heat exchange between the first and second air streams and the amount of moisture exchange between the first and second air streams vary by adjustment to the rotating speed of the adsorption rotor (), and the humidity controller apparatus () is switched between a dehumidification operation and a humidification/heating operation. During the dehumidification operation, the rotating speed of the adsorption rotor () is set low. The first air stream is dehumidified by the adsorption rotor () and then supplied to the inside of a room. The second air stream is used for regeneration of the adsorption rotor () and then discharged to the outside of the room. During the humidification/heating operation, the rotating speed of the adsorption rotor () is set high. The first air stream receives heat and moisture from the adsorption rotor () and then is supplied to the inside of the room. The second air stream is heat/moisture-adsorbed by the adsorption rotor () and then discharged to the outside of the room.


Find Patent Forward Citations

Loading…