The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Mar. 09, 2010
Filed:
Feb. 16, 2007
Beat Guggisberg, Untersiggenthal, CH;
Vishal Bisen, Turgi, CH;
Beat Guggisberg, Untersiggenthal, CH;
Vishal Bisen, Turgi, CH;
ABB Schweiz AG, Baden, CH;
Abstract
A device for the feeding of auxiliary operating facilities for a fuel-electrically driven vehicle with a combustion engine is stated, which device comprises a generator driven by the combustion engine and a rectifier connected with a generator on the AC voltage side, wherein the rectifier on the DC voltage side is connected with a first and a second connection of a DC voltage circuit. Alternatively, first and second rectifiers connected with the generator on the AC voltage side can be provided, wherein the first rectifier is connected on the DC voltage side with a first and a second connection of a first DC voltage circuit and the second rectifier on the DC voltage side with a first and a second connection of a second DC voltage circuit. Saving of space required and increased robustness and resistance to faults are achieved in that a first and a second step-down converter each is connected with the first and second connection of the DC voltage circuit, and that the first step-down converter is connected with a first DC voltage rail system for the feeding of first auxiliary operating facilities and that the second step-down converter is connected with a second DC voltage rail system for the feeding of second auxiliary operating facilities. As an alternative to the second step-down converter a further rectifier connected with the generator on the AC voltage side can also be provided, wherein then the first step-down converter is still connected with the first DC voltage rail system for the feeding of first auxiliary operating facilities and the further rectifier is connected with the second DC voltage rail system for the feeding of second auxiliary operating facilities.