The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jan. 09, 2007

Filed:

May. 10, 2004
Applicants:

Michael B. Jones, Redmond, WA (US);

John Regehr, Bellevue, WA (US);

Inventors:

Michael B. Jones, Redmond, WA (US);

John Regehr, Bellevue, WA (US);

Assignee:

Microsoft Corporation, Redmond, WA (US);

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
G06F 9/00 (2006.01); G06F 15/173 (2006.01);
U.S. Cl.
CPC ...
Abstract

The present invention provides providing predictable scheduling of programs using repeating precomputed schedules on discretely scheduled and/or multiprocessor operating systems. In one embodiment, a scheduler accesses an activity scheduling graph. The activity scheduling graph is comprised of nodes each representing a recurring execution interval, and has one root, one or more leaves, and at least one path from the root to each leaf. Each node is on at least one path from the root to a leaf, and the number of times the execution interval represented by each node occurs during the traversal of the graph is equal to the number of paths from the root to a leaf that the node is on. Each node has associated with it an execution interval length, and is adapted to being dedicated to executing the threads of a single activity. There may be one scheduling graph for each processor, or a scheduling graph may traverse multiple processors. Start and end times for reservations and constraints are adjusted to compensate for the granularity of the clock of the system. Furthermore, the scheduler may use an existing priority-based scheduler in order to cause scheduling decisions it has made to be acted upon.


Find Patent Forward Citations

Loading…