The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Apr. 19, 2005
Filed:
May. 25, 2004
Dirk Herke, Nuertingen, DE;
Thomas Kanamueller, Esslingen, DE;
Dirk Herke, Nuertingen, DE;
Thomas Kanamueller, Esslingen, DE;
Alcoa Fujikura Gesellschaft mit beschraenkter Haftung, Frickenhausen, DE;
Abstract
In order to improve a control device for operating a load circuit having at least one electric motor, this control device comprising a control stage which generates a pulse width modulated control signal, a power stage supplying the load circuit and having an electronic switch activated by the pulse width modulated control signal, a freewheeling element connected in parallel to the load circuit and a blocking monitoring means which generates a measurement switch-off interval by suppressing at least one switch-on interval of the pulse width modulated control signal, monitors the voltage in the load circuit during the measurement switch-off interval, compares it to a limit value and generates a blocking state signal in accordance with the comparison, in such a manner that a differentiated analysis of the voltages occurring in the measurement switch-off interval is possible it is suggested that for monitoring at least two electric motors connected in parallel in the load circuit the blocking monitoring means carry out a test run with at least one measurement cycle, in which a voltage sampling is carried out at different defined points in time after the start of at least one measurement switch-off interval and that the voltages determined in the load circuit during the voltage samplings be compared with at least one limit value.