The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 27, 2001

Filed:

Apr. 02, 1999
Applicant:
Inventor:

Thomas J. Moutinho, Gorham, ME (US);

Assignee:

National Semiconductor Corporation, Santa Clara, CA (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H01L 2/144 ;
U.S. Cl.
CPC ...
H01L 2/144 ;
Abstract

A process for maintaining a semiconductor substrate layer (e.g. a TiN, W or TEOS) deposition equipment chamber in a preconditioned and low particulate state between successive layer depositions. The first step is determining that the equipment chamber has been in an idle state for more than a first predetermined time period. In the second step, the equipment chamber pressure is reduced to its base pressure in the absence of gas flow, while maintaining the equipment chamber at a first predetermined temperature. In the third step, the equipment chamber is maintained at a second predetermined temperature for a second predetermined time period. During this step, the equipment chamber pressure is held at a first predetermined pressure, while an inert gas is discharged at a first predetermined inert gas flow rate through the equipment chamber. The pressure, time period and gas flow rate in this step are selected in such a way that adequate and thorough heating (i.e. preconditioning) of the equipment chamber and any associated hardware is provided. During the fourth step, the equipment chamber is purged with a inert gas(s) at a second predetermined inert gas flow rate that is greater than the first predetermined inert gas flow rate, to dislodge particulates within the equipment chamber, while maintaining the equipment chamber at a third predetermined temperature. The process sequence from the second step to the fourth step is repeated a predetermined number of times, typically 4 to 6 times. The equipment chamber is then returned to the idle state.


Find Patent Forward Citations

Loading…