The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 15, 2000

Filed:

Jun. 23, 1998
Applicant:
Inventors:

Mizanur Rahman, Minneapolis, MN (US);

Roberto Capriotti, Farmington, MN (US);

Jerry J Conley, Waseca, MN (US);

Gary B Mortensen, Waseca, MN (US);

Assignee:

Itron, Inc., Spokane, WA (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
G01R / ;
U.S. Cl.
CPC ...
702189 ; 702 60 ; 702 61 ; 702 64 ; 324178 ; 324144 ;
Abstract

A power consumption meter is disclosed for measuring the power consumed by a load on a power conductor, wherein the electronics of the power consumption meter are isolated from lightning and power transients. The meter has a first GMR sensor that is disposed proximate the power conductor and is magnetically coupled to the power conductor. The first GMR sensor detects magnetic flux in the power conductor and produces a first output responsive to the detected magnetic flux that is representative of the current flowing through the power conductor. A second GMR sensor is disposed proximate the power conductor and is magnetically coupled to the power conductor. The second GMR sensor detects magnetic flux in the power conductor and produces a second output responsive to the detected magnetic flux that is representative of the voltage on the power conductor. A processor is operably communicatively coupled to the first and second GMR sensors and is responsive to the first output and the second output for producing a third output that is representative of the energy consumption of the load on the power conductor. In an embodiment, a third GMR sensor provides feedback for auto-scaling of the first GMR sensor.


Find Patent Forward Citations

Loading…