The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Aug. 24, 1999

Filed:

Sep. 12, 1997
Applicant:
Inventor:

David W Gruszczynski, II, Rochester, NY (US);

Assignee:

Eastman Kodak Company, Rochester, NY (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
B08B / ; G05D / ;
U.S. Cl.
CPC ...
134 2211 ; 134 2212 ; 134 36 ; 7386104 ; 364510 ;
Abstract

A method for hydrodynamic cleaning of a piping system using two-phase flow. A model for predicting peak wall shear stress for two-phase flow is used to determine an optimum flow rate ratio which achieves a maximum wall shear stress in the particular piping system to be cleaned. The optimum flow rate is first established by turning on the liquid and gas flows through the piping system to be cleaned and allowing the flow to reach steady state conditions. The back pressure of the system is measured and the optimization model is used to determine the optimum flow rate ratio. Once the optimum flow rate ratio has been calculated, the liquid flow rate and the gas flow rates can be adjusted such that the optimum ratio is achieved. The two-phase back pressure is then measured to verify that the optimum flow rate ratio has been used. This is done by comparing the measured optimum two-phase flow back pressure with the initial two-phase back pressure used in the equations. If there is a variance between the two back pressures then the measured back pressure is substituted into the equations for the initial back pressure and the optimum flow rate ratio is recalculated. This step is repeated until the measured back pressure is equal to the back pressure used in the calculations. Cleaning is then performed at that optimum flow rate ratio.


Find Patent Forward Citations

Loading…