The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Jun. 23, 1998
Filed:
Nov. 22, 1996
Seong-Ho Ahn, Seoul, KR;
Samsung Heavy Industries Co., Ltd., Seoul, KR;
Abstract
A method for carrying out a surface finishing work with an electronically controlled hydraulic excavator is disclosed. The present invention includes the steps of: selecting an automatic surface finishing work, and inputting a desired work angle (S1); detecting the current positions of the respective attachment (S32); deciding the bucket maintaining angle relative to the horizontal plane (S3); correcting the work angle relative to the equipment inclination (S4); judging as to whether the control lever for the dipper stick is manipulated by the operator (S7); judging as to whether or not there is a swinging operation by the operator (S9); correcting the swinging angle and the inclination angle when carrying out the swinging operation (S10); compensating the departure amount of the bucket end from the initially inputted work plane during the swinging (S11); calculating the linear velocity of the bucket end L which is proportionate to the actuation of the control lever for the dipper stick (S12); deciding a velocity for satisfying the positions of the cylinders corresponding to the intended angles of the bucket, the dipper stick and the boom (S15); making corrections for feasible velocities calculating the target velocities of the respective cylinders for arriving to the target positions (S17); correcting the velocities of the cylinders compensating the velocity of the cylinders and the fluid discharge amount of the pump (S19); and terminating the operation after the end of the work (S21).