The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 26, 1996

Filed:

Jan. 24, 1995
Applicant:
Inventors:

Kevin R Mengelt, Port Edwards, WI (US);

Michael J Cane, Mauston, WI (US);

Mark L Schultz, Wisconsin Rapids, WI (US);

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H02H / ;
U.S. Cl.
CPC ...
361 93 ; 361 18 ; 307 66 ;
Abstract

A backup power system has power supply lines extending from input terminals, connectable to a main AC power system, and output terminals, connectable to a load, with a relay connected in a power supply line. The AC input power is monitored and when a fault in the power is detected, the relay is opened and an inverter is simultaneously turned on to provide backup power from a battery to the output terminals at a phase and frequency synchronized with the AC input voltage before the fault occurs. When the AC power system power is restored, the inverter power is again synchronized with the AC input power at the input terminals, the relay switch is closed and the inverter is turned off to allow the main power system to provide power to the load. The inverter may be providing power to the power lines before the relay contacts are opened to minimize the disruption of power supplied to the load during transfers. The switching of the switching devices in the inverter is cut off if the current drawn by the inverter from the battery exceeds a current limit level, but is turned on again after a short period of time less than a cycle of the AC waveform to again attempt to provide power from the inverter to the load. This process may be repeated, if necessary, to provide power to loads which require higher currents during start-up of the load than during normal operation after start-up.

Published as:

Find Patent Forward Citations

Loading…