The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Jan. 02, 1990
Filed:
Feb. 06, 1989
Kazushige Umezawa, Himeji, JP;
Tatsuro Kuwabara, Himeji, JP;
Tetsuya Oh-hara, Himeji, JP;
Tsuzuru Nuibe, Himeji, JP;
Kousaku Ozawa, Himeji, JP;
Nippon Steel Corporation, Tokyo, JP;
Abstract
A method of melting an iron-containing cold material and simultaneously obtaining a low phosphorous and high carbon molten iron while maintaining a high post combustion rate, comprising the steps of: preparing a converter having a lance for top-blowing oxygen, and a bottom-blowing triple pipe nozzle disposed at a bottom of the converter which nozzle is provided with an inner pipe, an intermediate pipe and an outer pipe; supplying the iron-containing cold material into the converter in which a hot heel exists; introducing into the converter all of a carbonaceous material together with a non-oxidizing gas through the inner pipe of the triple pipe nozzle, oxygen through a space defined between the inner pipe and the intermediate pipe, and a non-oxidizing cooling gas through another space defined between the intermediate pipe and the outer pipe, and additional oxygen through the oxygen top-blowing lance so that the cold material is melted into a molten iron under an existence of slag; maintaining both the content of carbon dissolved in the molten iron at a level of 3 to 4% in most of a period of time for the melting and the rate of bottom-blown oxygen in a range of not less than 10% but less than 20% of the total amount of the oxygen; and adding intermittently or successively iron oxide into the slag in most of a melting period of time while keeping a slag basicity defined by CaO/SiO.sub.2 in a range of 1.5 to 3.0.