The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Dec. 10, 1985
Filed:
Jun. 08, 1984
Sadao Yanada, Hitachi, JP;
Naganobu Honda, Hitachi, JP;
Hisanori Miyagaki, Hitachiohta, JP;
Seiitsu Nigawara, Hitachi, JP;
Hitachi, Ltd., Tokyo, JP;
Abstract
A method of controlling the operation of a thermoelectric power generating plant, in which the operation of the steam generating equipment and the turbine is controlled in accordance with the plant operation parameters obtained from given patterns of start up and operation of the plant. The method comprises: temporarily setting, in accordance with the above-mentioned patterns, the plant operation parameters concerning the rates of change of state of the plant such as the rates of turbine acceleration and turbine load and rates of increase of the main steam temperature and pressure; estimating the change of the quantity of state of main steam at a designated future moment; estimating the thermal stresses in respective stress-evaluation portions of the boiler and turbine; comparing the estimated thermal stresses with respective allowable thermal stresses determined so as to correspond to the consumption of the life allowed for each start up and operation cycle of the plant; selecting one of the estimated thermal stresses which has smaller margin to the allowable thermal stress and obtaining the operation parameter which provided the maximum rate of change of the state of the plant; repeating these steps until the command state is attained; and controlling the boiler and the turbine in accordance with the thus obtained plant operation parameter.