The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Nov. 20, 1984

Filed:

Jan. 14, 1983
Applicant:
Inventors:

Greg G Peters, Spring, TX (US);

Robert C West, Houston, TX (US);

Assignee:

Exxon Production Research Co., Houston, TX (US);

Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
E21B / ;
U.S. Cl.
CPC ...
166259 ; 166261 ; 166245 ;
Abstract

Fluid, such as liquid water, is injected into the rock surrounding an in situ oil shale retort at sufficient pressure and flow rate so that the injected fluid flows toward the retort to block the path of hot liquid and gaseous kerogen decomposition products escaping from the retort and to return heat to the retort. The successful conduct of an oil shale retorting operation usually requires that the retort temperature be maintained at a temperature sufficient to decompose efficiently the kerogen contained in the oil shale. By reducing the heat loss from an active retort, the amount of energy required to maintain a desired temperature therein is reduced. The fluid injection method also maintains pressure in an in-situ oil shale retort, allowing in-situ oil shale retorting to be efficiently conducted at a desired pressure. The method also reduces the danger to mineworkers who may be engaged in adjacent mining operations due to the escape of hazardous gases from an active retort. The method allows a series of sequential in-situ oil shale retorts in an oil shale formation to be placed more closely together than previously practical by reducing hot fluid leakage from each active retort to one or more abandoned retorts adjacent thereto, thus improving the recovery factor from the formation. The method also minimizes contamination of the formation surrounding an active in-situ retort due to hazardous chemicals which may be contained in the kerogen decomposition products leaking from the retort.


Find Patent Forward Citations

Loading…