The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Feb. 23, 1982

Filed:

Nov. 26, 1979
Applicant:
Inventors:

Satoshi Ninomiya, Hitachi, JP;

Yasuhiro Yamachi, Hitachi, JP;

Katsukuni Hisano, Hitachi, JP;

Ryosuke Arie, Katsuta, JP;

Katsuto Kashiwahara, Hitachi, JP;

Hidesumi Kuwashima, Hitachi, JP;

Assignee:

Hitachi, Ltd., Tokyo, JP;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
F01K / ;
U.S. Cl.
CPC ...
60646 ; 60656 ; 60715 ;
Abstract

A cross compound turbine apparatus and method of operating the same wherein the apparatus includes a first turbine generator having a high pressure turbine and a first low pressure turbine connected to a first generator driving shaft, with the second turbine generator having an intermediate pressure turbine connected to a second generator driving shaft. Driving steam is supplied to the high pressure turbine and a primary steam line communicates exhaust steam from the high pressure turbine to drive the intermediate pressure turbine during a steady state operation of the first and second turbine generator sections. A bypass steam line communicates steam from the system supplying driving steam to the high pressure turbine to the intermediate pressure turbine in a bypassing relationship to the high pressure turbine. A control arrangement controls the flow of steam in the primary and bypass steam lines during a starting operating of the turbine generator sections, with the control arrangement being adapted to maintain the relative speeds of the first and second generator driving shafts in a predetermined synchronsis ratio. A controllable vent arrangement is provided for venting a portion of the steam flow in the primary steam line during starting operations. By virtue of these features, a speed synchronization of multiturbine sections can be obtained in an efficient and inexpensive manner without causing excessive heat rise in the turbine blades.


Find Patent Forward Citations

Loading…