The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Sep. 22, 2026

Filed:

Sep. 30, 2025
Applicant:

Rajiv Kumar Varma, London, CA;

Inventor:

Rajiv Kumar Varma, London, CA;

Assignee:
Attorney:
Primary Examiner:
Assistant Examiner:
Int. Cl.
CPC ...
H02J 3/01 (2026.01); H02J 3/1842 (2026.01); H02J 3/38 (2026.01); H02J 3/388 (2026.01); H02J 3/40 (2026.01); H02J 9/00 (2006.01); H02J 101/24 (2026.01); H02M 7/44 (2006.01);
U.S. Cl.
CPC ...
H02J 3/01 (2013.01); H02J 3/1842 (2013.01); H02J 3/381 (2013.01); H02J 3/388 (2020.01); H02J 3/40 (2013.01); H02J 9/00 (2013.01); H02M 7/44 (2013.01); H02J 2101/24 (2026.01); Y02E 10/56 (2013.01); Y02E 40/10 (2013.01); Y02E 40/20 (2013.01); Y02E 40/40 (2013.01);
Abstract

A method and system for controlling a photovoltaic solar power generation source operatively coupled to a power grid system at a point of common coupling (PCC) to perform a plurality of dynamic reactive power control based functions including: reactive power set point control, power factor control, and voltage control, when its primary energy source is not available, and available. Voltage control may also prevent PCC voltage from violating a voltage limit caused by real power generation from itself or by real power generation from an additional distributed power generation source operatively connected to said power grid system, or by both. Controlling a battery energy storage based distributed power generation source operatively coupled to a power grid system at a PCC to perform reactive power set point control, power factor control, and voltage control, during both the conditions when its primary energy source is not available, and available is also provided.


Find Patent Forward Citations

Loading…