The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Jun. 30, 2026

Filed:

May. 05, 2023
Applicant:

Bluwave Inc., Ottawa, CA;

Inventors:

Babak Asghari, Vancouver, CA;

Devashish Paul, Ottawa, CA;

Alexander Linchieh, Ottawa, CA;

Thomas Triplet, Ottawa, CA;

Assignee:

BluWave Inc., Ottawa, CA;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H02J 3/38 (2026.01); H02J 3/00 (2026.01); H02J 3/008 (2026.01); H02J 15/00 (2026.01); H02J 15/50 (2026.01); H02J 101/20 (2026.01); H02J 103/35 (2026.01);
U.S. Cl.
CPC ...
H02J 3/381 (2013.01); H02J 3/003 (2020.01); H02J 3/004 (2020.01); H02J 3/008 (2013.01); H02J 15/50 (2026.01); H02J 2101/20 (2026.01); H02J 2103/35 (2026.01);
Abstract

Systems and methods are provided involving executing an optimizer using output power information of a renewable energy generator (REG) and market information, and executing an energy management system to manage the utilization of power generated by the REG based on the optimization. The REG is associated with a hydrogen production plant (HPP) for producing hydrogen, and the HPP is powered at least by the REG. The management of the power generated by the REG includes generating an electricity market offer to an electrical grid and a hydrogen market offer to an hydrogen distribution system. The system then dispatches REG power to the electrical grid and hydrogen to the hydrogen distribution system based on the generated market offers. REG output power typically fluctuates over time, as do other potentially relevant factors, such as consumer electricity demand, electricity transmission capacity, electricity market prices, hydrogen market prices, etc. The system can provide optimized control over the REG and HPP as conditions change over time.


Find Patent Forward Citations

Loading…