The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Apr. 28, 2026

Filed:

Jan. 12, 2022
Applicant:

Vestas Wind Systems A/s, Aarhus, DK;

Inventors:

Kouroush Nayebi, Ikast, DK;

Torsten Lund, Fredericia, DK;

Frank Ormel, Skanderborg, DK;

Mogens Bjerning, Ringkøbing, DK;

Assignee:
Attorneys:
Primary Examiner:
Int. Cl.
CPC ...
F03D 7/04 (2006.01); F03D 7/02 (2006.01); F03D 9/00 (2016.01); G05B 19/042 (2006.01); G06Q 50/06 (2012.01); H02J 3/38 (2006.01); F03D 9/25 (2016.01); H02J 3/17 (2026.01); H02J 3/46 (2006.01); H02J 101/28 (2026.01);
U.S. Cl.
CPC ...
F03D 7/0284 (2013.01); F03D 7/048 (2013.01); F03D 9/007 (2013.01); G05B 19/042 (2013.01); G06Q 50/06 (2013.01); H02J 3/381 (2013.01); F03D 9/255 (2017.02); F05B 2220/708 (2013.01); F05B 2270/1033 (2013.01); G05B 2219/2619 (2013.01); H02J 3/17 (2026.01); H02J 3/46 (2013.01); H02J 2101/28 (2026.01);
Abstract

A method for controlling a renewable energy farm comprising a plurality of wind turbines and at least one central control unit is disclosed. The wind turbines of the renewable energy farm are connected to a power grid. The central control unit receives a request for change in operation of at least one of the wind turbines, where execution of the change in operation causes a change in power output of the wind turbine. The central control unit checks whether or not the change in power output is in conflict with at least one obligation of the renewable energy farm towards the power grid. In the case that the change in power output is in conflict with at least one obligation of the renewable energy farm towards the power grid, execution of the change in operation is deferred.