The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Apr. 07, 2026
Filed:
Sep. 14, 2022
Applicant:
Saudi Arabian Oil Company, Dhahran, SA;
Inventors:
Mohammed A. Bataweel, Dhahran, SA;
Eyad Alali, Al Ahsa, SA;
Mustafa Alkhowaildi, Safwa, SA;
Nour Baqader, Khobar, SA;
Norah Aljuryyed, Dhahran, SA;
Assignee:
Saudi Arabian Oil Company, Dhahran, SA;
Attorney:
Primary Examiner:
Int. Cl.
CPC ...
H01M 8/0606 (2016.01); C01B 3/042 (2026.01); C01B 5/00 (2006.01); C01B 17/04 (2006.01); C12P 3/00 (2006.01); E21B 41/00 (2006.01); H01M 8/0656 (2016.01); H01M 10/44 (2006.01); H01M 10/46 (2006.01); H01M 16/00 (2006.01); H02J 7/34 (2006.01); H02J 15/00 (2006.01);
U.S. Cl.
CPC ...
H01M 8/0606 (2013.01); C01B 3/042 (2013.01); C01B 5/00 (2013.01); C01B 17/0426 (2013.01); C01B 17/0495 (2013.01); C12P 3/00 (2013.01); E21B 41/0085 (2013.01); H01M 8/0656 (2013.01); H01M 10/44 (2013.01); H01M 10/46 (2013.01); H01M 16/006 (2013.01); H02J 7/342 (2020.01); H02J 15/008 (2020.01); H01M 2220/10 (2013.01); H01M 2250/10 (2013.01);
Abstract
Techniques for generating electric power for well site operations include processing a hydrocarbon fluid produced from a subterranean formation, through a wellbore, and to a terranean surface into at least one acid gas; processing the at least one acid gas into hydrogen; generating, with the hydrogen, electrical power from a hydrogen engine; and providing the generated electrical power for use or storage to power at least one electrically-operated machine to perform at least one well site operation.