The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.

The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.

Date of Patent:
Mar. 31, 2026

Filed:

Sep. 23, 2021
Applicant:

Casco Signal Ltd., Shanghai, CN;

Inventors:

Jiqing Na, Shanghai, CN;

Tao Wang, Shanghai, CN;

Zhixin Chen, Shanghai, CN;

Yajing Zhang, Shanghai, CN;

Liang Guo, Shanghai, CN;

Assignee:

CASCO SIGNAL LTD., Shanghai, CN;

Attorney:
Primary Examiner:
Int. Cl.
CPC ...
B61L 15/00 (2006.01); B61L 23/16 (2006.01); B61L 25/02 (2006.01); B61L 27/20 (2022.01); B61L 27/70 (2022.01);
U.S. Cl.
CPC ...
B61L 15/0054 (2013.01); B61L 15/0027 (2013.01); B61L 23/16 (2013.01); B61L 25/025 (2013.01); B61L 27/20 (2022.01); B61L 27/70 (2022.01); B61L 2205/04 (2013.01);
Abstract

The disclosure relates to a light train control system applied to oversea freight railways. The system integrates automatic block, station turnout control and train operation overspeed protection control and comprises an on-board subsystem, an RBC subsystem and a satellite positioning differential base station management subsystem, wherein the on-board subsystem is respectively connected to the RBC subsystem and the satellite positioning differential base station management subsystem. The light train control system adopts two-way continuous train-ground wireless communication and uses on-board signals as main signals of train operation to control the train operation; meanwhile, the system monitors the train operation, so as to provide an alarm to a driver when the situation changes, and to brake a train when necessary; and the system uses an electronic map to manage line data of a whole line, achieves dynamic configuration of the transport capacity by means of a virtual block technology, and remotely controls basic signaling equipment by means of an RBC. Compared with the prior art, the disclosure has the advantages of efficient system operation and simplified trackside equipment.


Find Patent Forward Citations

Loading…