The patent badge is an abbreviated version of the USPTO patent document. The patent badge does contain a link to the full patent document.
The patent badge is an abbreviated version of the USPTO patent document. The patent badge covers the following: Patent number, Date patent was issued, Date patent was filed, Title of the patent, Applicant, Inventor, Assignee, Attorney firm, Primary examiner, Assistant examiner, CPCs, and Abstract. The patent badge does contain a link to the full patent document (in Adobe Acrobat format, aka pdf). To download or print any patent click here.
Patent No.:
Date of Patent:
Dec. 30, 2025
Filed:
Jan. 12, 2022
State Grid Jiangsu Electric Power Engineering Consulting Co., Ltd., Jiangsu, CN;
State Grid Jiangsu Electric Power Co., Ltd., Jiangsu, CN;
Jianming Xu, Jiangsu, CN;
Bing Chen, Jiangsu, CN;
Aigen Pei, Jiangsu, CN;
Hongping Xie, Jiangsu, CN;
Changqing Du, Jiangsu, CN;
Bin Bo, Jiangsu, CN;
Zhangxuan Wang, Jiangsu, CN;
Jiao Zhu, Jiangsu, CN;
Chao Han, Jiangsu, CN;
Zhou Fan, Jiangsu, CN;
Wentao Shen, Jiangsu, CN;
Jian Du, Jiangsu, CN;
Lai Xu, Jiangsu, CN;
State Grid Jiangsu Electric Power Engineering Consulting Co., Ltd., Nanjing, CN;
State Grid Jiangsu Electric Power Co., Ltd., Nanjing, CN;
Abstract
A power transmission and transformation project acceptance method based on building information modeling (BIM) and point cloud measurement includes: S1: constructing a BIM model based on a design drawing, where the BIM model includes standard parameters of key components of a power transmission and transformation project; S2: obtaining point cloud data, and constructing a point cloud data model based on the point cloud data, where the point cloud data model includes actual parameters of the key components of the power transmission and transformation project; S3: comparing the BIM model with the point cloud data model to obtain construction acceptance data; and S4: visualizing the construction acceptance data and outputting an acceptance report to complete acceptance of the power transmission and transformation project. The BIM model and the point cloud data model are compared to implement rapid and efficient acceptance of the power transmission and transformation project.